The extra hall your school was told it couldn’t afford
200+ installations
UK Manufacturer
The squeeze every school knows
So the squeeze gets accepted, year after year. It does not have to be.
One hall. Every use.






The geodesic multi-use hall
A permanent, clear-span building with no internal columns, engineered to serve for decades - one room that flexes between exam hall, assembly, drama and full-size sport, with no conversion work in between. Delivered turnkey, planning through to handover.
Request a budget figurePick the room. The structure price is fixed.
Each price below is for the geodesic structure itself - supply, delivery and installation. Groundworks and flooring are the one site-specific cost, quoted after a short site visit, so you get one clear, complete quote before you commit.
The Big Room
18 × 12 × 5 m · 216 m²
£99,000
supply, delivery and installation
One affordable, flexible room.
The School Hall
24 × 12 × 6 m · 288 m²
£130,000
supply, delivery and installation
Assemblies, PE and school events.
The Sports Hall
18 × 36 × 9 m · 648 m²
£215,000
supply, delivery and installation
Takes a netball, tennis, pickleball or padel court.
Every size includes a double-insulated membrane and standard lighting. Extra windows, lighting and heating/cooling are options. Groundworks and flooring are priced separately, per site, following a site visit.
A fraction of a brick build
A conventional brick hall
£1.6m-£3m
Off the table for most schools.
A Covair hall
From £99,000 for the structure
Supply, delivery and installation at a fixed price - groundworks and flooring quoted per site after a short visit. On this year's agenda, not a decade away.
A VAT point worth checking
Now that school fees carry VAT, the VAT on a capital project may be recoverable against fee income, depending on your position - worth a word with your finance advisor.
Schools already trust Covair to keep the game on
At Millfield - one of the UK's leading independent schools for sport - pupils train under a permanent, climate-controlled Covair dome, open every day of the year, whatever the weather crosses the Somerset Levels. A 16m × 33.8m professional-standard structure that means not a session is lost to the season.
Cox Green School and St Helens School are among the schools already using Covair structures to protect sport and teaching time from the weather. Covair has been enabling covered sport since 1982.
Protect the asset. Extend the season. Keep the game on.
What it gives the school
Curriculum time back
Exams no longer displace PE - the timetable stops bending around exam season.
All-year use
A weather-independent space that works every week of the year, winter included.
Lettings income
Hired to clubs and holiday camps, it turns a cost centre into an income line.
What happens next
Enquire
Tell us about your school, your site and what the space needs to do.
Budget figure
We put a figure and an outline in front of you - before anyone commits to anything.
Site visit
We visit, confirm feasibility, and map the route from planning to handover.
See the number before you commit
Tell us about your school and the space you're missing, and we'll put a budget figure and outline in front of you - before anyone commits to anything.
- A real figure for your site, not a range
- No obligation and no hard sell
- Costed for your actual site and how you'll use it